Overview
ABB FN258-16/29 3BHB011317R0001 Spare Part for Factory Uptime
The ABB FN258-16/29 (part number 3BHB011317R0001) is an original EMC line filter engineered for continuous-duty industrial drive and power conversion applications. As a maintenance-proven spare part, it plays a critical role in suppressing conducted electromagnetic interference on the AC supply side of ABB ACS/ACS800/ACS880 series variable frequency drives and similar power electronics platforms. Keeping a verified replacement unit on the shelf is the single most effective measure a maintenance team can take to eliminate unplanned downtime caused by EMC filter degradation, insulation breakdown, or capacitor aging in high-cycle production environments.
The FN258-16/29 is rated for 16 A continuous current with a 29 A peak capability, making it suitable for drive input stages operating on 3-phase 400–480 V AC networks. Its compact DIN-rail or panel-mount footprint integrates directly into existing control cabinet layouts without rewiring the upstream supply or downstream drive terminals. Maintenance engineers working on ABB ACS550, ACS800, or ACS880 drive cabinets will find the FN258-16/29 a direct form-fit-function replacement that restores EMC compliance to EN 61800-3 Category C2/C3 without additional commissioning steps.
Every unit supplied by KNMKS is sourced from authorized distribution channels, individually inspected, and tested for insulation resistance, leakage current, and insertion loss before shipment. A support terms confirmed by quotation cover all units against manufacturing defects and premature failure under normal operating conditions. Expedited air freight and regional stock availability support emergency replacement scenarios where production continuity cannot tolerate extended lead times.
Spare Maintenance Table
| Part Number | 3BHB011317R0001 |
| Model / SKU | FN258-16/29 |
| Brand | ABB |
| Series | FN258 |
| Product Type | EMC Line Filter (AC Input Side) |
| Rated Current | 16 A continuous / 29 A peak |
| Voltage Range | 3-phase 400–480 V AC, 50/60 Hz |
| Attenuation Standard | EN 61800-3 Category C2 / C3 |
| Mounting | Panel mount / DIN rail compatible |
| Country of Origin | Germany (DE) |
| Compatible Drives | ABB ACS550, ACS800, ACS880 series and equivalent |
| Application Environment | Industrial drive cabinets, motor control centers, power conversion panels |
| Maintenance Interval | Inspect annually; replace on capacitor aging, leakage current rise, or insulation failure |
| Pre-shipment Testing | Insulation resistance, leakage current, insertion loss verified |
| Support terms | 12 months from shipment date |
| Lead Time | Ex-stock or 3–7 business days (subject to availability) |
Maintenance Planning for Continuous Operation
When scheduling a replacement of the FN258-16/29 EMC line filter, a disciplined maintenance engineer will treat the intervention as an opportunity to audit the entire upstream and downstream electrical circuit rather than a simple component swap. Begin with the AC supply side: verify that the upstream circuit breaker or fuse — typically a 20 A type-B or type-C MCB — is within its rated interrupting capacity and shows no signs of contact erosion or thermal discoloration. Check the input terminal block (e.g., ABB ENTRELEC or Phoenix Contact UK series) for loose connections, oxidation, or insulation creep that could introduce impedance mismatch and degrade filter performance after reinstallation.
On the drive side, inspect the DC bus capacitors and the drive’s own internal EMC suppression network. In ACS800 and ACS880 platforms, the internal common-mode choke works in tandem with the external FN258-16/29; a degraded choke will cause the replacement filter to operate outside its design insertion-loss curve within weeks. If the drive has been in service for more than five years, consider scheduling a preventive replacement of the ACS880 input rectifier bridge or the ACS550 power board alongside the filter change to avoid a second cabinet opening within the same maintenance window.
Signal integrity should also be verified during the same outage. Check the PROFIBUS DP or PROFINET communication cable routing inside the cabinet — EMC filter replacement is a common trigger for inadvertent cable displacement. Inspect the 24 V DC auxiliary power supply (e.g., ABB CP-E 24/2.5 or equivalent SITOP unit) that powers the drive control board and any connected I/O modules; a marginal power supply will cause intermittent drive faults that are easily misdiagnosed as EMC-related after a filter change. If the cabinet includes a signal isolator or galvanic separator on the 4–20 mA analog input channels, verify isolation resistance and zero/span calibration before returning the drive to automatic mode.
For facilities running multiple ACS800 or ACS880 drives on the same MCC bus, it is best practice to maintain at least one FN258-16/29 unit in the on-site spare parts kit alongside a matched set of input fuses, a spare 24 V DC power supply module, and a pre-terminated PROFIBUS connector. This kit approach eliminates the most common causes of extended downtime during emergency call-outs and supports a mean-time-to-repair target of under two hours for drive-related stoppages.
Site Replacement Workflow
Step 1 — Isolation and lockout: De-energize the drive cabinet at the upstream isolator and apply LOTO. Confirm zero voltage at the filter input terminals with a calibrated CAT III multimeter before opening the cabinet door.
Step 2 — Document existing wiring: Photograph or sketch the L1/L2/L3 input and output terminal connections, PE bonding point, and any cable ferrite cores fitted to the filter output leads. The FN258-16/29 is phase-sequence sensitive; incorrect reconnection will not damage the filter but may cause drive phase-loss faults.
Step 3 — Remove the failed unit: Loosen the M4 or M5 mounting screws, disconnect the input and output power terminals, and remove the PE bonding conductor. Note the torque specification on the terminal label (typically 2.5–3.0 N·m for the power terminals).
Step 4 — Install the replacement FN258-16/29: Mount the new unit in the same orientation, reconnect PE first, then power terminals in documented sequence. Torque all terminals to specification. Do not omit the PE bonding conductor — the filter’s leakage current path depends on a low-impedance earth connection for safe operation.
Step 5 — Pre-energization checks: Measure insulation resistance between L1/L2/L3 and PE (minimum 100 MΩ at 500 V DC). Verify no short circuit between phases. Re-check all terminal connections for tightness.
Step 6 — Energize and verify: Restore power, observe drive startup sequence, and confirm no EMC-related fault codes. Run the motor at 50% load for 15 minutes and re-check terminal temperatures with a thermal camera or contact thermometer before returning to full production.
This workflow is compatible with ABB ACS550, ACS800, and ACS880 installations and supports back-to-back compatibility with the previous FN258-16/29 revision without firmware or parameter changes.
Spare Parts Support FAQ
Q1: Is the FN258-16/29 (3BHB011317R0001) still in production, and can KNMKS guarantee long-term supply?
The FN258-16/29 remains an active ABB catalog item as of the current supply period. KNMKS maintains regional buffer stock and works with multiple authorized distribution channels to ensure continuity of supply. For facilities with planned maintenance schedules extending 12–36 months, we recommend placing a blanket order to lock in pricing and reserve allocation.
Q2: How is each unit tested before shipment?
Every FN258-16/29 unit undergoes a pre-shipment inspection covering insulation resistance (≥100 MΩ at 500 V DC), leakage current measurement, and visual inspection of terminal integrity and housing condition. Units that do not meet specification are quarantined and not shipped. A test record is available on request.
Q3: Can the FN258-16/29 replace earlier FN258 series variants in existing ABB drive cabinets?
The FN258-16/29 is designed for direct form-fit-function replacement within the FN258 series. Compatibility with specific drive models should be confirmed against the drive’s hardware manual or the ABB spare parts catalog. KNMKS technical support can assist with cross-reference verification before order placement.
Q4: What does the support terms confirmed by quotation cover, and what is the claims process?
The support terms confirmed by quotation cover manufacturing defects and premature failure under normal operating conditions as defined by the ABB product specification. It does not cover damage resulting from incorrect installation, overvoltage events, or operation outside rated parameters. To initiate a support terms claim, contact admin@knmks.com with the order number, installation date, and a description of the failure mode. Replacement units are dispatched within 5 business days of claim approval.
© 2026 KNMKS. All rights reserved.
Original Source: https://knmks.com
Contact: admin@knmks.com | +86 18359268345
Product Identification
- Brand / Ecosystem
-
ABB
ABB - Model / Series
- FN258-16/29-3BHB011317R0001
- Product Family
- Other Components
- Availability Status
- Available on request after model and quantity confirmation
- Inquiry Type
- B2B RFQ, replacement inquiry and project spare-part request
- Pre-Quote Check
- Exact SKU, brand, series, quantity, nameplate photos and destination country are checked before quotation
System Path
Where this product fits in the KNMKS automation structure.
Specification & Inquiry Focus
- Component range
- Breakers, terminals and cabinet accessories
- Common needs
- Model, photo and installation requirement
- Project support
- Maintenance and mixed spare-part inquiry
Buyer Confirmation
Information KNMKS checks before replying.
- Exact model
- FN258-16/29-3BHB011317R0001
- Brand / ecosystem
- ABB
- Product family
- Other Components
- Application note
- Replacement, maintenance, project build or spare-part list
- Useful photos
- Nameplate, installed unit, cabinet layout or connector side
- Delivery details
- Quantity, destination country and target schedule
Document Support
Files and notes can be confirmed during quotation.
- Product photos or nameplate confirmation when available
- Packing and delivery notes before quotation confirmation
- Support scope and delivery terms confirmed per inquiry
- Export document coordination for qualified B2B requests
Inquiry Support
- Mixed automation spare parts inquiry
- Cabinet component and accessory support
- Model identification from photos or labels
What to Send Us
- Brand and exact model number: ABB FN258-16/29-3BHB011317R0001
- Quantity and required delivery time
- Application, replacement requirement or nameplate photo
- Destination country and shipping preference
RFQ Preparation
This is a product inquiry page built for RFQ communication.
Fast Model Check
Send this model to KNMKS for confirmation.
Include quantity, destination country and photos if this is a maintenance replacement. The inquiry will be saved with a reference number after submission.
Brand & Compatibility Note
KNMKS displays automation product information for well-known industrial brand ecosystems and compatible replacement references. Brand names are used for product identification and compatibility reference only; final availability and commercial terms are confirmed per quotation.
Manufacturing
Machine Tools
Packaging
Energy & Power
PLCs & Controllers
HMI & Displays
Servo Systems
Variable Frequency Drives